| Port | Beanr, Begne, Bezee |
| Date logged | 2025/10/27 |
| Alert type | Severe weather conditions |
| Impact | Complete closure |
| Description | Pilotstation Steenbank suspended for all vessels – 27-10-2025 00:51 Pilotstation Steenbank suspended for non-swath operable vessels only – 25-10-2025 20:13 Pilotstation Steenbank suspended for all vessels – 25-10-2025 12:37 Pilotstation Steenbank suspended for non-swath operable vessels only – 25-10-2025 10:00 |
| Port | Beanr, Begne, Bezee |
| Date logged | 2025/10/27 |
| Alert type | Other |
| Impact | Delays |
| Description | Disruption Category: Other Source: Port Authority Ports: Antwerpen – BEANR Locations: Oosterweel Start: 31-10-2025 05:00 End: 02-11-2025 04:00 Updated: 26-10-2025 22:51 Description: Complete traffic obstruction at Oosterweel due to Oosterweel tunnel construction works – 31-10-2025 05:00 |