Update to Suez Canal Solid Waste Fees

The Suez Canal Authority has issued Periodical No. 2/2026, which amends Article Two of Circular No. 2/2025 governing the collection and management of vessel waste in Suez Canal waters. The amendment refines the schedule of fees for non-dangerous and dangerous solid waste, as well as the charges for using a self‑propelled barge.

Revised mandatory fees

Mandatory fees now apply to all vessels and floating units for the collection and management of non‑dangerous solid wastes, calculated according to Suez Canal Net Tonnage.

Suez Canal Net Tonnage (Net Tons)Mandatory Fees (USD)Volume of solid wastes included in the mandatory fees (cubic meters m3)
Up to 50002353
Over 5000 to 100002353
Over 10000 to 200008254
Over 20000 to 400008254
Over 40000 to 7000011204
Over 70000 to 12000014105
Over 12000014105

Additional volumes and dangerous waste

For non‑dangerous solid waste volumes exceeding those included in the mandatory fee, and for vessels and small craft exempted from the mandatory schedule, a rate of USD 99 per additional cubic meter applies. Dangerous solid waste remains an optional service and is charged at USD 1,000 per cubic meter.

Self‑propelled barge hire and start date

The SCA has confirmed that hiring a self‑propelled barge is charged per usage, with no fee for the first hour and USD 200 for each additional hour starting from the second hour.

The amended provisions set out in Periodical No. 2/2026 will be applied from 15 April 2026.

If you have any questions or require more details on Suez Canal transit, please do not hesitate to contact our team at [email protected]